| Issue |
Title |
File |
| Vol 14, No 1 (2024) |
An integrated approach to reliability assessment of spatial metal structures |
 (Rus)
|
|
Mushchanov V.F., Orzhekhovskiy A.N., Tseplyaev M.N., Mushchanov A.V.
|
| Vol 14, No 1 (2024) |
Flood study in the downstream of the rivers Sai Gon – Dong Nai |
 (Rus)
|
|
Markova I.M., Khanh P.K.
|
| Vol 14, No 1 (2024) |
Stress-strain state of some special places in earth dam from viewpoint of hydraulic fracturing |
 (Rus)
|
|
Orekhov G.V., Cuong T.M.
|
| Vol 14, No 1 (2024) |
Friction area size of the friction bolted connection |
 (Rus)
|
|
Vasilkin A.A., Zubkov G.V., Prokaev S.A., Vasilkin I.A.
|
| Vol 14, No 1 (2024) |
Investigation of physical and mechanical characteristics of aluminium alloys 1915T, 1565ch and 6082-T6 at low temperatures |
 (Rus)
|
|
Shuvalov A.N., Kornev O.A., Ermakov V.A.
|
| Vol 14, No 1 (2024) |
The effect of arrangement of reinforced concrete elements on perception of seismic loads by the foundation |
 (Rus)
|
|
Anh L.D., Sidorov V.V.
|
| Vol 14, No 3 (2024) |
The first aluminium alloy road bridge in Russia |
 (Rus)
|
|
Korgin A.V., Vasiliev E.V., Maslov O.G.
|
| Vol 14, No 3 (2024) |
Parameters of non-linear models of soil for analysis of stress-strain state of a rockfill dam |
 (Rus)
|
|
Kotov F.V., Sainov M.P.
|
| Vol 14, No 2 (2024) |
Filtration of the dam of the PSPP upper basin |
 (Rus)
|
|
Aniskin N.A., Stupivtsev A.V.
|
| Vol 14, No 2 (2024) |
Structure and content of the NPP life cycle stage management platform |
 (Rus)
|
|
Alshraideh M., Engovatov I.А., Morozenko A.А.
|
| Vol 14, No 2 (2024) |
Defects of reinforced concrete chimneys in modern operating conditions |
 (Rus)
|
|
Ermakov V.A., Nikolaev S.A.
|
| Vol 14, No 2 (2024) |
Foundation of the turbine unit of a thermal power plant on a construction site made of thixotropic soils |
 (Rus)
|
|
Nikitina N.S., Bezgribelnaya A.E.
|
| Vol 14, No 2 (2024) |
Development of sports infrastructure in the Russian Federation |
 (Rus)
|
|
Kachanova S.V.
|
| Vol 13, No 2 (2023) |
Stress-strain state of the Yumaguzinsky hydroelectric dam |
 (Rus)
|
|
Burenkov P.M.
|
| Vol 13, No 2 (2023) |
Flow velocity field of the Saigon River section during operation of flood control structures |
 (Rus)
|
|
Markova I.M., Khanh P.K.
|
| Vol 13, No 4 (2023) |
Optimization of pile field structural calculations based on CPT data |
 (Rus)
|
|
Nedviga P.N., Kukina A.A., Tachkov M.A.
|
| Vol 13, No 4 (2023) |
Investigation of hydrodynamic impact on an unevenly buried pipeline in a permeable bottom |
 (Rus)
|
|
Sherstnev D.Y., Bryanskaya Y.V.
|
| Vol 13, No 4 (2023) |
Oscillations of point-supported square slabs |
 (Rus)
|
|
Abovyan A.G., Marutyan A.S., Abovyan G.A.
|
| Vol 13, No 4 (2023) |
Perspective of CLT-panels application in multi-storey construction |
 (Rus)
|
|
Dvortsova A.S., Ushakov A.Y.
|
| Vol 13, No 1 (2023) |
Methodology for evaluating the bearing capacity of a deep excavation barrette in complex geotechnical conditions in Hanoi |
 (Rus)
|
|
Nikitina N.S., Hieu Le T.
|
| Vol 13, No 1 (2023) |
Operation of braced steel frameworks with regard to assembly and fabrication errors |
 (Rus)
|
|
Hamaty Y.R., Tusnin A.R.
|
| Vol 13, No 1 (2023) |
Review of methods for predicting the hydraulic failure of a rockfill core dam |
 (Rus)
|
|
Sainov M.P., Boldin A.A.
|
| Vol 13, No 1 (2023) |
Stress-strain state of a triangular truss with uncut chords of a five-sided composite profile |
 (Rus)
|
|
Melyokhin E.A.
|
| Vol 13, No 1 (2023) |
A flow chart as one of tools improving the quality of repair and construction work |
 (Rus)
|
|
Kustikova Y.O., Pankova E.V.
|
| Vol 13, No 1 (2023) |
Formation of an organisational and technological mechanism to improve the manufacturability of works in total building renovation |
 (Rus)
|
|
Petrosyan R.S.
|
| 1 - 25 of 29 Items |
1 2 > >>
|