Selection of New Turbine Runners at the Nizhegorodskaya HPP with Due Regard for Existing Performance Conditions
- Autores: Ivanchenko I.P.1, Shchur V.A.1
-
Afiliações:
- JSC NPO CKTI (Polzunov Scientific and Development Association on Research and Design of Power Equipment)
- Edição: Volume 49, Nº 6 (2016)
- Páginas: 430-435
- Seção: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245001
- DOI: https://doi.org/10.1007/s10749-016-0641-7
- ID: 245001
Citar
Resumo
Replacement of equipment at the Nizhegorodskaya HPP, which had long ago exhausted its normative service life, is considered, with due regard for existing performance conditions and hydraulic unit design aspects. Parameters for a new turbine are substantiated for the hydroeconomic situation currently existing at the HPP.
Sobre autores
I. Ivanchenko
JSC NPO CKTI (Polzunov Scientific and Development Association on Research and Design of Power Equipment)
Email: el.stantsii@gmail.com
Rússia, St. Petersburg
V. Shchur
JSC NPO CKTI (Polzunov Scientific and Development Association on Research and Design of Power Equipment)
Email: el.stantsii@gmail.com
Rússia, St. Petersburg
Arquivos suplementares
