Selection of New Turbine Runners at the Nizhegorodskaya HPP with Due Regard for Existing Performance Conditions
- Authors: Ivanchenko I.P.1, Shchur V.A.1
-
Affiliations:
- JSC NPO CKTI (Polzunov Scientific and Development Association on Research and Design of Power Equipment)
- Issue: Vol 49, No 6 (2016)
- Pages: 430-435
- Section: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245001
- DOI: https://doi.org/10.1007/s10749-016-0641-7
- ID: 245001
Cite item
Abstract
Replacement of equipment at the Nizhegorodskaya HPP, which had long ago exhausted its normative service life, is considered, with due regard for existing performance conditions and hydraulic unit design aspects. Parameters for a new turbine are substantiated for the hydroeconomic situation currently existing at the HPP.
About the authors
I. P. Ivanchenko
JSC NPO CKTI (Polzunov Scientific and Development Association on Research and Design of Power Equipment)
Email: el.stantsii@gmail.com
Russian Federation, St. Petersburg
V. A. Shchur
JSC NPO CKTI (Polzunov Scientific and Development Association on Research and Design of Power Equipment)
Email: el.stantsii@gmail.com
Russian Federation, St. Petersburg