Selection of New Turbine Runners at the Nizhegorodskaya HPP with Due Regard for Existing Performance Conditions


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

Replacement of equipment at the Nizhegorodskaya HPP, which had long ago exhausted its normative service life, is considered, with due regard for existing performance conditions and hydraulic unit design aspects. Parameters for a new turbine are substantiated for the hydroeconomic situation currently existing at the HPP.

作者简介

I. Ivanchenko

JSC NPO CKTI (Polzunov Scientific and Development Association on Research and Design of Power Equipment)

Email: el.stantsii@gmail.com
俄罗斯联邦, St. Petersburg

V. Shchur

JSC NPO CKTI (Polzunov Scientific and Development Association on Research and Design of Power Equipment)

Email: el.stantsii@gmail.com
俄罗斯联邦, St. Petersburg

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media New York, 2016