Selection of New Turbine Runners at the Nizhegorodskaya HPP with Due Regard for Existing Performance Conditions
- Авторлар: Ivanchenko I.P.1, Shchur V.A.1
-
Мекемелер:
- JSC NPO CKTI (Polzunov Scientific and Development Association on Research and Design of Power Equipment)
- Шығарылым: Том 49, № 6 (2016)
- Беттер: 430-435
- Бөлім: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245001
- DOI: https://doi.org/10.1007/s10749-016-0641-7
- ID: 245001
Дәйексөз келтіру
Аннотация
Replacement of equipment at the Nizhegorodskaya HPP, which had long ago exhausted its normative service life, is considered, with due regard for existing performance conditions and hydraulic unit design aspects. Parameters for a new turbine are substantiated for the hydroeconomic situation currently existing at the HPP.
Авторлар туралы
I. Ivanchenko
JSC NPO CKTI (Polzunov Scientific and Development Association on Research and Design of Power Equipment)
Email: el.stantsii@gmail.com
Ресей, St. Petersburg
V. Shchur
JSC NPO CKTI (Polzunov Scientific and Development Association on Research and Design of Power Equipment)
Email: el.stantsii@gmail.com
Ресей, St. Petersburg
Қосымша файлдар
