Commissioning of the PGU-220 Steam-Gas Power Generating Unit at the TÉTS-12 Thermal Power Plant of PJSC “Mosenergo”


Cite item

Full Text

Open Access Open Access
Restricted Access Access granted
Restricted Access Subscription Access

Abstract

From September 1, 2013, through May 31, 2015, startup-adjustment work and equipment tests for the startup system for the PGU-220 steam-gas power unit at the TÉTs-12 thermal power plant of PJSC “Mosenergo” were carried out under the leadership of the general contractor JSC “TÉK Mosenergo,” JSC “VTI,” (setup and testing of thermal and mechanical equipment) with the participation of JSC “Firma ORGRÉS” (post-installation cleaning of the boiler-utilizer and adjustment of the water-chemical treatment regime). The basic results of this commissioning activity and test startup of the power generating unit are presented.

About the authors

Yu. A. Radin

JSC “All-Russia Thermal Engineering Institute” (VTI)

Author for correspondence.
Email: vti@vti.ru
Russian Federation, Moscow

S. V. Rumyantsev

PJSC “Mosenergo”

Email: vti@vti.ru
Russian Federation, Moscow

V. B. Smyshlyaev

JSC “All-Russia Thermal Engineering Institute” (VTI)

Email: vti@vti.ru
Russian Federation, Moscow

D. I. Gorlatov

CHP-12 (TÉTs-12)—branch of PJSC “Mosenergo”

Email: vti@vti.ru
Russian Federation, Moscow

I. A. Grishin

JSC “All-Russia Thermal Engineering Institute” (VTI)

Email: vti@vti.ru
Russian Federation, Moscow


Copyright (c) 2016 Springer Science+Business Media New York