From September 1, 2013, through May 31, 2015, startup-adjustment work and equipment tests for the startup system for the PGU-220 steam-gas power unit at the TÉTs-12 thermal power plant of PJSC “Mosenergo” were carried out under the leadership of the general contractor JSC “TÉK Mosenergo,” JSC “VTI,” (setup and testing of thermal and mechanical equipment) with the participation of JSC “Firma ORGRÉS” (post-installation cleaning of the boiler-utilizer and adjustment of the water-chemical treatment regime). The basic results of this commissioning activity and test startup of the power generating unit are presented.

Об авторах

Yu. Radin

JSC “All-Russia Thermal Engineering Institute” (VTI)

Автор, ответственный за переписку.
Email: vti@vti.ru
Россия, Moscow

S. Rumyantsev

PJSC “Mosenergo”

Email: vti@vti.ru
Россия, Moscow

V. Smyshlyaev

JSC “All-Russia Thermal Engineering Institute” (VTI)

Email: vti@vti.ru
Россия, Moscow

D. Gorlatov

CHP-12 (TÉTs-12)—branch of PJSC “Mosenergo”

Email: vti@vti.ru
Россия, Moscow

I. Grishin

JSC “All-Russia Thermal Engineering Institute” (VTI)

Email: vti@vti.ru
Россия, Moscow


© Springer Science+Business Media New York, 2016

Данный сайт использует cookie-файлы

Продолжая использовать наш сайт, вы даете согласие на обработку файлов cookie, которые обеспечивают правильную работу сайта.

О куки-файлах