From September 1, 2013, through May 31, 2015, startup-adjustment work and equipment tests for the startup system for the PGU-220 steam-gas power unit at the TÉTs-12 thermal power plant of PJSC “Mosenergo” were carried out under the leadership of the general contractor JSC “TÉK Mosenergo,” JSC “VTI,” (setup and testing of thermal and mechanical equipment) with the participation of JSC “Firma ORGRÉS” (post-installation cleaning of the boiler-utilizer and adjustment of the water-chemical treatment regime). The basic results of this commissioning activity and test startup of the power generating unit are presented.

作者简介

Yu. Radin

JSC “All-Russia Thermal Engineering Institute” (VTI)

编辑信件的主要联系方式.
Email: vti@vti.ru
俄罗斯联邦, Moscow

S. Rumyantsev

PJSC “Mosenergo”

Email: vti@vti.ru
俄罗斯联邦, Moscow

V. Smyshlyaev

JSC “All-Russia Thermal Engineering Institute” (VTI)

Email: vti@vti.ru
俄罗斯联邦, Moscow

D. Gorlatov

CHP-12 (TÉTs-12)—branch of PJSC “Mosenergo”

Email: vti@vti.ru
俄罗斯联邦, Moscow

I. Grishin

JSC “All-Russia Thermal Engineering Institute” (VTI)

Email: vti@vti.ru
俄罗斯联邦, Moscow


版权所有 © Springer Science+Business Media New York, 2016
##common.cookie##