Commissioning of the PGU-220 Steam-Gas Power Generating Unit at the TÉTS-12 Thermal Power Plant of PJSC “Mosenergo”


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

From September 1, 2013, through May 31, 2015, startup-adjustment work and equipment tests for the startup system for the PGU-220 steam-gas power unit at the TÉTs-12 thermal power plant of PJSC “Mosenergo” were carried out under the leadership of the general contractor JSC “TÉK Mosenergo,” JSC “VTI,” (setup and testing of thermal and mechanical equipment) with the participation of JSC “Firma ORGRÉS” (post-installation cleaning of the boiler-utilizer and adjustment of the water-chemical treatment regime). The basic results of this commissioning activity and test startup of the power generating unit are presented.

Sobre autores

Yu. Radin

JSC “All-Russia Thermal Engineering Institute” (VTI)

Autor responsável pela correspondência
Email: vti@vti.ru
Rússia, Moscow

S. Rumyantsev

PJSC “Mosenergo”

Email: vti@vti.ru
Rússia, Moscow

V. Smyshlyaev

JSC “All-Russia Thermal Engineering Institute” (VTI)

Email: vti@vti.ru
Rússia, Moscow

D. Gorlatov

CHP-12 (TÉTs-12)—branch of PJSC “Mosenergo”

Email: vti@vti.ru
Rússia, Moscow

I. Grishin

JSC “All-Russia Thermal Engineering Institute” (VTI)

Email: vti@vti.ru
Rússia, Moscow


Declaração de direitos autorais © Springer Science+Business Media New York, 2016

Este site utiliza cookies

Ao continuar usando nosso site, você concorda com o procedimento de cookies que mantêm o site funcionando normalmente.

Informação sobre cookies