Optimizing Cupriferous Ore Output at Oktyabrsky Copper–Nickel Deposit, Considering Lag Factor


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

The lag modeling procedure makes it possible to solve a dynamic problem of optimization of mine design capacity by the maximum integral optimality criteria. The lag factor has influence on asymptotic dependence between the optimal mine deign capacity and mineral reserves, which governs the decrease in the limiting efficiency of mineral mining. The lag models are used to substantiate the optimal cupriferous ore output of room-and-pillar mining in the West site if Oktyabrsky copper–nickel deposit.

Sobre autores

A. Ordin

Chinakal Institute of Mining, Siberian Branch

Autor responsável pela correspondência
Email: ordin@misd.ru
Rússia, Krasnyi pr. 54, Novosibirsk, 630091

I. Vasil’ev

SibgiproZoloto

Email: ordin@misd.ru
Rússia, Krasnyi pr. 1, Novosibirsk, 630007

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Pleiades Publishing, Ltd., 2017