Optimizing Cupriferous Ore Output at Oktyabrsky Copper–Nickel Deposit, Considering Lag Factor
- Авторлар: Ordin A.A.1, Vasil’ev I.V.2
-
Мекемелер:
- Chinakal Institute of Mining, Siberian Branch
- SibgiproZoloto
- Шығарылым: Том 53, № 3 (2017)
- Беттер: 497-503
- Бөлім: Mineral Mining Technology
- URL: https://journals.rcsi.science/1062-7391/article/view/184256
- DOI: https://doi.org/10.1134/S1062739117032427
- ID: 184256
Дәйексөз келтіру
Аннотация
The lag modeling procedure makes it possible to solve a dynamic problem of optimization of mine design capacity by the maximum integral optimality criteria. The lag factor has influence on asymptotic dependence between the optimal mine deign capacity and mineral reserves, which governs the decrease in the limiting efficiency of mineral mining. The lag models are used to substantiate the optimal cupriferous ore output of room-and-pillar mining in the West site if Oktyabrsky copper–nickel deposit.
Негізгі сөздер
Авторлар туралы
A. Ordin
Chinakal Institute of Mining, Siberian Branch
Хат алмасуға жауапты Автор.
Email: ordin@misd.ru
Ресей, Krasnyi pr. 54, Novosibirsk, 630091
I. Vasil’ev
SibgiproZoloto
Email: ordin@misd.ru
Ресей, Krasnyi pr. 1, Novosibirsk, 630007
Қосымша файлдар
