Efficiency of cyclical-and-continuous method in open pit mining


Cite item

Full Text

Open Access Open Access
Restricted Access Access granted
Restricted Access Subscription Access

Abstract

The article reviews in brief application of cyclical-and-continuous method in the conveyor-andtruck haulage in open pit mines. Consumption of materials and power is evaluated as a function of mined rock haulage volumes and depth of crush-and-reload station position in an open pit mine. The change in capital and operational cost to transport ore and hard overburden is studied at varied distances from a crushand- reload station in open pit to a surface receiving station. Efficiency of the conveyor-and-truck haulage using cyclical-and-continuous method is evaluated. In terms of deep and large mineral deposits, the authors substantiate positions for crush-and-reload stations in large open pit mines.

About the authors

V. L. Yakovlev

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
Russian Federation, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

G. D. Karmaev

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
Russian Federation, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

V. A. Bersenev

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
Russian Federation, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

A. V. Glebov

Institute of Mining, Ural Branch

Author for correspondence.
Email: glebov@igduran.ru
Russian Federation, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

A. V. Semenkin

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
Russian Federation, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

I. G. Sumina

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
Russian Federation, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

Supplementary files

Supplementary Files
Action
1. JATS XML

Copyright (c) 2016 Pleiades Publishing, Ltd.