Efficiency of cyclical-and-continuous method in open pit mining
- Autores: Yakovlev V.L.1, Karmaev G.D.1, Bersenev V.A.1, Glebov A.V.1, Semenkin A.V.1, Sumina I.G.1
-
Afiliações:
- Institute of Mining, Ural Branch
- Edição: Volume 52, Nº 1 (2016)
- Páginas: 102-109
- Seção: Mineral Mining Technology
- URL: https://journals.rcsi.science/1062-7391/article/view/183453
- DOI: https://doi.org/10.1134/S1062739116010174
- ID: 183453
Citar
Resumo
The article reviews in brief application of cyclical-and-continuous method in the conveyor-andtruck haulage in open pit mines. Consumption of materials and power is evaluated as a function of mined rock haulage volumes and depth of crush-and-reload station position in an open pit mine. The change in capital and operational cost to transport ore and hard overburden is studied at varied distances from a crushand- reload station in open pit to a surface receiving station. Efficiency of the conveyor-and-truck haulage using cyclical-and-continuous method is evaluated. In terms of deep and large mineral deposits, the authors substantiate positions for crush-and-reload stations in large open pit mines.
Sobre autores
V. Yakovlev
Institute of Mining, Ural Branch
Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219
G. Karmaev
Institute of Mining, Ural Branch
Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219
V. Bersenev
Institute of Mining, Ural Branch
Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219
A. Glebov
Institute of Mining, Ural Branch
Autor responsável pela correspondência
Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219
A. Semenkin
Institute of Mining, Ural Branch
Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219
I. Sumina
Institute of Mining, Ural Branch
Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219
Arquivos suplementares
