Efficiency of cyclical-and-continuous method in open pit mining


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

The article reviews in brief application of cyclical-and-continuous method in the conveyor-andtruck haulage in open pit mines. Consumption of materials and power is evaluated as a function of mined rock haulage volumes and depth of crush-and-reload station position in an open pit mine. The change in capital and operational cost to transport ore and hard overburden is studied at varied distances from a crushand- reload station in open pit to a surface receiving station. Efficiency of the conveyor-and-truck haulage using cyclical-and-continuous method is evaluated. In terms of deep and large mineral deposits, the authors substantiate positions for crush-and-reload stations in large open pit mines.

Sobre autores

V. Yakovlev

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

G. Karmaev

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

V. Bersenev

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

A. Glebov

Institute of Mining, Ural Branch

Autor responsável pela correspondência
Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

A. Semenkin

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

I. Sumina

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
Rússia, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Pleiades Publishing, Ltd., 2016