Efficiency of cyclical-and-continuous method in open pit mining


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The article reviews in brief application of cyclical-and-continuous method in the conveyor-andtruck haulage in open pit mines. Consumption of materials and power is evaluated as a function of mined rock haulage volumes and depth of crush-and-reload station position in an open pit mine. The change in capital and operational cost to transport ore and hard overburden is studied at varied distances from a crushand- reload station in open pit to a surface receiving station. Efficiency of the conveyor-and-truck haulage using cyclical-and-continuous method is evaluated. In terms of deep and large mineral deposits, the authors substantiate positions for crush-and-reload stations in large open pit mines.

作者简介

V. Yakovlev

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
俄罗斯联邦, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

G. Karmaev

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
俄罗斯联邦, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

V. Bersenev

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
俄罗斯联邦, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

A. Glebov

Institute of Mining, Ural Branch

编辑信件的主要联系方式.
Email: glebov@igduran.ru
俄罗斯联邦, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

A. Semenkin

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
俄罗斯联邦, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

I. Sumina

Institute of Mining, Ural Branch

Email: glebov@igduran.ru
俄罗斯联邦, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620219

补充文件

附件文件
动作
1. JATS XML

版权所有 © Pleiades Publishing, Ltd., 2016