Aggregation in Job-Shop Scheduling Problems on Facilities with Conveyor Assembly of Finished Products
- Autores: Khobotov E.N.1, Ermolova M.A.2
-
Afiliações:
- Trapeznikov Institute of Control Sciences
- Bauman State Technical University
- Edição: Volume 80, Nº 5 (2019)
- Páginas: 913-926
- Seção: Optimization, System Analysis, and Operations Research
- URL: https://journals.rcsi.science/0005-1179/article/view/151392
- DOI: https://doi.org/10.1134/S0005117919050096
- ID: 151392
Citar
Resumo
We consider problem settings and methods of job-shop scheduling on mechanical engineering facilities whose production departments manufacture components, and the final products are assembled on conveyors. Job schedules are constructed both in terms of incoming orders for manufactured products and in terms of existing demand and storage costs at the company warehouses until the moment of sale.
Sobre autores
E. Khobotov
Trapeznikov Institute of Control Sciences
Autor responsável pela correspondência
Email: e_khobotov@mail.ru
Rússia, Moscow
M. Ermolova
Bauman State Technical University
Autor responsável pela correspondência
Email: ermolova.88@mail.ru
Rússia, Moscow
Arquivos suplementares
