Aggregation in Job-Shop Scheduling Problems on Facilities with Conveyor Assembly of Finished Products
- Авторлар: Khobotov E.N.1, Ermolova M.A.2
-
Мекемелер:
- Trapeznikov Institute of Control Sciences
- Bauman State Technical University
- Шығарылым: Том 80, № 5 (2019)
- Беттер: 913-926
- Бөлім: Optimization, System Analysis, and Operations Research
- URL: https://journals.rcsi.science/0005-1179/article/view/151392
- DOI: https://doi.org/10.1134/S0005117919050096
- ID: 151392
Дәйексөз келтіру
Аннотация
We consider problem settings and methods of job-shop scheduling on mechanical engineering facilities whose production departments manufacture components, and the final products are assembled on conveyors. Job schedules are constructed both in terms of incoming orders for manufactured products and in terms of existing demand and storage costs at the company warehouses until the moment of sale.
Авторлар туралы
E. Khobotov
Trapeznikov Institute of Control Sciences
Хат алмасуға жауапты Автор.
Email: e_khobotov@mail.ru
Ресей, Moscow
M. Ermolova
Bauman State Technical University
Хат алмасуға жауапты Автор.
Email: ermolova.88@mail.ru
Ресей, Moscow
Қосымша файлдар
