Issue |
Title |
File |
Vol 77, No 11 (2016) |
A-equilibrium and fuzzy A-core in pure exchange model with externalities |
|
Vasil’ev V.A.
|
Vol 77, No 8 (2016) |
H2-optimization of sampled-data systems with a linear periodic plant. I. Parametric transfer matrix and its properties |
|
Lampe B.P., Rosenwasser E.N.
|
Vol 77, No 9 (2016) |
H2-optimization of sampled-data systems with a linear periodic plant. II. H2-optimization of system St based on the Wiener–Hopf method |
|
Lampe B.P., Rosenwasser E.N.
|
Vol 77, No 8 (2016) |
α-Systems of differential inclusions and their unification |
|
Ushakov V.N., Brykalov S.A., Parshikov G.V.
|
Vol 77, No 11 (2016) |
A branch and cut heuristic for a runway scheduling problem |
|
Vasilyev I.L., Avella P., Boccia M.
|
Vol 80, No 10 (2019) |
A Class of Semiparametric Tail Index Estimators and Its Applications |
|
Vaičiulis M., Markovich N.M.
|
Vol 77, No 11 (2016) |
A combined work optimization technology under resource constraints with an application to road repair |
|
Lempert A.A., Sidorov D.N., Zhukov A.V., Nguyen G.L.
|
Vol 79, No 3 (2018) |
A Comparison of System Area Networks: Generalized Extended Multiring vs Flattened Butterfly |
|
Podlazov V.S.
|
Vol 79, No 4 (2018) |
A Computer Network with Fast Distributed Reconfiguration and Data Processing During Transfer |
|
Stetsyura G.G.
|
Vol 80, No 2 (2019) |
A Control Algorithm for an Object with Delayed Input Signal Based on Subpredictors of the Controlled Variable and Disturbance |
|
Furtat I.B., Gushchin P.A.
|
Vol 79, No 1 (2018) |
A Correction Method of Electrocardiographic Interval Subject to Heart Rate |
|
Gorlishchev V.P., Kalinin L.A., Mikhalskii A.I., Shkolnikova M.A., Shkolnikov V.M.
|
Vol 80, No 6 (2019) |
A Game-Theoretic Model of Agreement on Limitation of Transboundary Air Pollution |
|
Vasin A.A., Divtsova A.G.
|
Vol 77, No 8 (2016) |
A game-theoretic model of TV show “The Voice” |
|
Konovalchikova E.N., Mazalov V.V.
|
Vol 79, No 4 (2018) |
A Game-Theoretic Model of Virtual Operators Competition in a Two-Sided Telecommunication Market |
|
Mazalov V.V., Chirkova Y.V., Zheng J., Lien J.W.
|
Vol 79, No 11 (2018) |
A Hybrid Control System for an Unstable Non-Stationary Plant with a Predictive Model |
|
Mitrishkin Y.V., Golubtsov M.P.
|
Vol 80, No 11 (2019) |
A Hybrid Exact Algorithm for the Asymmetric Traveling Salesman Problem: Construction and a Statistical Study of Computational Efficiency |
|
Zhukova G.N., Ul’yanov M.V., Fomichev M.I.
|
Vol 79, No 12 (2018) |
A Linear Algorithm for Restructuring a Graph |
|
Gorbunov K.Y., Lyubetsky V.A.
|
Vol 78, No 11 (2017) |
A mathematical model of transmitting a non-ordinary flow with periodic reservations and block acknowledgements in a channel with correlated noise |
|
Ivanov A.S., Lyakhov A.I., Khorov E.M.
|
Vol 78, No 3 (2017) |
A method for increasing the rate of parametric convergence in the problem of identification of the sinusoidal signal parameters |
|
Wang J., Gritsenko P.A., Aranovskiy S.V., Bobtsov A.A., Pyrkin A.A.
|
Vol 79, No 9 (2018) |
A Method of Generating Random Vectors with a Given Probability Density Function |
|
Darkhovsky B.S., Popkov Y.S., Popkov A.Y., Aliev A.S.
|
Vol 80, No 1 (2019) |
A Method to Bypass Dangerous Zones in the Horizontal Plane |
|
Merkulov V.I., Plyashechnik A.S.
|
Vol 79, No 2 (2018) |
A Method to Provide Conditions for Sustained Excitation |
|
Wang J., Aranovskiy S.V., Bobtsov A.A., Pyrkin A.A., Kolyubin S.A.
|
Vol 79, No 2 (2018) |
A Methodology for Estimating the Benefits of Mass Production Automation |
|
Aristova N.I., Chadeev V.M.
|
Vol 79, No 5 (2018) |
A Methodology of Automation Cost Assessment under Given Defective Products Probability |
|
Aristov N.I., Chadeev V.M.
|
Vol 78, No 4 (2017) |
A metric for total tardiness minimization |
|
Lazarev A.A., Korenev P.S., Sologub A.A.
|
1 - 25 of 683 Items |
1 2 3 4 5 6 7 8 9 10 > >> |