Aggregation in Job-Shop Scheduling Problems on Facilities with Conveyor Assembly of Finished Products
- Authors: Khobotov E.N.1, Ermolova M.A.2
-
Affiliations:
- Trapeznikov Institute of Control Sciences
- Bauman State Technical University
- Issue: Vol 80, No 5 (2019)
- Pages: 913-926
- Section: Optimization, System Analysis, and Operations Research
- URL: https://journals.rcsi.science/0005-1179/article/view/151392
- DOI: https://doi.org/10.1134/S0005117919050096
- ID: 151392
Cite item
Abstract
We consider problem settings and methods of job-shop scheduling on mechanical engineering facilities whose production departments manufacture components, and the final products are assembled on conveyors. Job schedules are constructed both in terms of incoming orders for manufactured products and in terms of existing demand and storage costs at the company warehouses until the moment of sale.
About the authors
E. N. Khobotov
Trapeznikov Institute of Control Sciences
Author for correspondence.
Email: e_khobotov@mail.ru
Russian Federation, Moscow
M. A. Ermolova
Bauman State Technical University
Author for correspondence.
Email: ermolova.88@mail.ru
Russian Federation, Moscow
Supplementary files
