Effectiveness of Large Power Reduction for a Combined-Cycle Power Plant with Several Gas Turbines and One Steam Turbine and Some of the Shutdown Equipment Used as Hot Reserve


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The change in the structure of generating capacities and the commissioning of combined-cycle power units with efficiency much higher than that of the best steam-power units motivated designing these units mainly for baseloads. However, the recent market changes in the generating capacities of Russia and other countries have required extending the normal operating range of CCPPs with HRSGs and accelerating hot start-ups after short (up to 8 – 10 hours) downtimes.

作者简介

Yu. Radin

All-Russia Thermal Engineering Institute

编辑信件的主要联系方式.
Email: vti-unit@yandex.ru
俄罗斯联邦, Moscow

V. Gombolevskii

All-Russia Thermal Engineering Institute

Email: vti-unit@yandex.ru
俄罗斯联邦, Moscow

V. Smyshlyaev

All-Russia Thermal Engineering Institute

Email: vti-unit@yandex.ru
俄罗斯联邦, Moscow

D. Rudenko

All-Russia Thermal Engineering Institute

Email: vti-unit@yandex.ru
俄罗斯联邦, Moscow


版权所有 © Springer Science+Business Media, LLC, part of Springer Nature, 2018
##common.cookie##