Effectiveness of Large Power Reduction for a Combined-Cycle Power Plant with Several Gas Turbines and One Steam Turbine and Some of the Shutdown Equipment Used as Hot Reserve


Cite item

Full Text

Open Access Open Access
Restricted Access Access granted
Restricted Access Subscription Access

Abstract

The change in the structure of generating capacities and the commissioning of combined-cycle power units with efficiency much higher than that of the best steam-power units motivated designing these units mainly for baseloads. However, the recent market changes in the generating capacities of Russia and other countries have required extending the normal operating range of CCPPs with HRSGs and accelerating hot start-ups after short (up to 8 – 10 hours) downtimes.

About the authors

Yu. A. Radin

All-Russia Thermal Engineering Institute

Author for correspondence.
Email: vti-unit@yandex.ru
Russian Federation, Moscow

V. I. Gombolevskii

All-Russia Thermal Engineering Institute

Email: vti-unit@yandex.ru
Russian Federation, Moscow

V. B. Smyshlyaev

All-Russia Thermal Engineering Institute

Email: vti-unit@yandex.ru
Russian Federation, Moscow

D. V. Rudenko

All-Russia Thermal Engineering Institute

Email: vti-unit@yandex.ru
Russian Federation, Moscow


Copyright (c) 2018 Springer Science+Business Media, LLC, part of Springer Nature