Effectiveness of Large Power Reduction for a Combined-Cycle Power Plant with Several Gas Turbines and One Steam Turbine and Some of the Shutdown Equipment Used as Hot Reserve
- Authors: Radin Y.A.1, Gombolevskii V.I.1, Smyshlyaev V.B.1, Rudenko D.V.1
-
Affiliations:
- All-Russia Thermal Engineering Institute
- Issue: Vol 52, No 1 (2018)
- Pages: 69-73
- Section: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/246081
- DOI: https://doi.org/10.1007/s10749-018-0911-7
- ID: 246081
Cite item
Abstract
The change in the structure of generating capacities and the commissioning of combined-cycle power units with efficiency much higher than that of the best steam-power units motivated designing these units mainly for baseloads. However, the recent market changes in the generating capacities of Russia and other countries have required extending the normal operating range of CCPPs with HRSGs and accelerating hot start-ups after short (up to 8 – 10 hours) downtimes.
About the authors
Yu. A. Radin
All-Russia Thermal Engineering Institute
Author for correspondence.
Email: vti-unit@yandex.ru
Russian Federation, Moscow
V. I. Gombolevskii
All-Russia Thermal Engineering Institute
Email: vti-unit@yandex.ru
Russian Federation, Moscow
V. B. Smyshlyaev
All-Russia Thermal Engineering Institute
Email: vti-unit@yandex.ru
Russian Federation, Moscow
D. V. Rudenko
All-Russia Thermal Engineering Institute
Email: vti-unit@yandex.ru
Russian Federation, Moscow