The change in the structure of generating capacities and the commissioning of combined-cycle power units with efficiency much higher than that of the best steam-power units motivated designing these units mainly for baseloads. However, the recent market changes in the generating capacities of Russia and other countries have required extending the normal operating range of CCPPs with HRSGs and accelerating hot start-ups after short (up to 8 – 10 hours) downtimes.

Авторлар туралы

Yu. Radin

All-Russia Thermal Engineering Institute

Хат алмасуға жауапты Автор.
Email: vti-unit@yandex.ru
Ресей, Moscow

V. Gombolevskii

All-Russia Thermal Engineering Institute

Email: vti-unit@yandex.ru
Ресей, Moscow

V. Smyshlyaev

All-Russia Thermal Engineering Institute

Email: vti-unit@yandex.ru
Ресей, Moscow

D. Rudenko

All-Russia Thermal Engineering Institute

Email: vti-unit@yandex.ru
Ресей, Moscow


© Springer Science+Business Media, LLC, part of Springer Nature, 2018

Осы сайт cookie-файлдарды пайдаланады

Біздің сайтты пайдалануды жалғастыра отырып, сіз сайттың дұрыс жұмыс істеуін қамтамасыз ететін cookie файлдарын өңдеуге келісім бересіз.< / br>< / br>cookie файлдары туралы< / a>