Development of Unrecoverable Displacements of the Dam of the Sayano-Shushenskaya Hydroelectric Power Plant While in Use Under Design Load Parameters (1990 – 2016)


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

Questions regarding the adaption of the dam of the Sayano-Shushenskaya hydroelectric power plant once the designed normal pool level had been reached in 1990 are considered. The impact of natural and technogenic factors on this process at different periods of operation of the structure (prior to repair of the dam and foundation (1990 – 1996), during repair (1996 – 2003), and following repairs (2004 – 2012) are investigated. Causes for amplification of asymmetry in operations between the left-bank and right-bank parts of the dam are established. Data attesting to the existence of a stabilized state of the structure in 2013 – 2016 are presented and conditions that will prevent the development of unrecoverable processes in the near future are formulated.

作者简介

N. Vul’fovich

JSC Lengidroproekt

编辑信件的主要联系方式.
Email: navulfovich@gmail.com
俄罗斯联邦, St. Petersburg

L. Potekhin

JSC Lengidroproekt

Email: navulfovich@gmail.com
俄罗斯联邦, St. Petersburg


版权所有 © Springer Science+Business Media, LLC, part of Springer Nature, 2018
##common.cookie##