Development of Unrecoverable Displacements of the Dam of the Sayano-Shushenskaya Hydroelectric Power Plant While in Use Under Design Load Parameters (1990 – 2016)


Cite item

Full Text

Open Access Open Access
Restricted Access Access granted
Restricted Access Subscription Access

Abstract

Questions regarding the adaption of the dam of the Sayano-Shushenskaya hydroelectric power plant once the designed normal pool level had been reached in 1990 are considered. The impact of natural and technogenic factors on this process at different periods of operation of the structure (prior to repair of the dam and foundation (1990 – 1996), during repair (1996 – 2003), and following repairs (2004 – 2012) are investigated. Causes for amplification of asymmetry in operations between the left-bank and right-bank parts of the dam are established. Data attesting to the existence of a stabilized state of the structure in 2013 – 2016 are presented and conditions that will prevent the development of unrecoverable processes in the near future are formulated.

About the authors

N. A. Vul’fovich

JSC Lengidroproekt

Author for correspondence.
Email: navulfovich@gmail.com
Russian Federation, St. Petersburg

L. P. Potekhin

JSC Lengidroproekt

Email: navulfovich@gmail.com
Russian Federation, St. Petersburg


Copyright (c) 2018 Springer Science+Business Media, LLC, part of Springer Nature

This website uses cookies

You consent to our cookies if you continue to use our website.

About Cookies