Development of Unrecoverable Displacements of the Dam of the Sayano-Shushenskaya Hydroelectric Power Plant While in Use Under Design Load Parameters (1990 – 2016)


Цитировать

Полный текст

Открытый доступ Открытый доступ
Доступ закрыт Доступ предоставлен
Доступ закрыт Только для подписчиков

Аннотация

Questions regarding the adaption of the dam of the Sayano-Shushenskaya hydroelectric power plant once the designed normal pool level had been reached in 1990 are considered. The impact of natural and technogenic factors on this process at different periods of operation of the structure (prior to repair of the dam and foundation (1990 – 1996), during repair (1996 – 2003), and following repairs (2004 – 2012) are investigated. Causes for amplification of asymmetry in operations between the left-bank and right-bank parts of the dam are established. Data attesting to the existence of a stabilized state of the structure in 2013 – 2016 are presented and conditions that will prevent the development of unrecoverable processes in the near future are formulated.

Об авторах

N. Vul’fovich

JSC Lengidroproekt

Автор, ответственный за переписку.
Email: navulfovich@gmail.com
Россия, St. Petersburg

L. Potekhin

JSC Lengidroproekt

Email: navulfovich@gmail.com
Россия, St. Petersburg


© Springer Science+Business Media, LLC, part of Springer Nature, 2018

Данный сайт использует cookie-файлы

Продолжая использовать наш сайт, вы даете согласие на обработку файлов cookie, которые обеспечивают правильную работу сайта.

О куки-файлах