Closure of the Bureya River in April 2016 and Filling of the Plinth of the Lower Bureya Dam


Цитировать

Полный текст

Открытый доступ Открытый доступ
Доступ закрыт Доступ предоставлен
Доступ закрыт Только для подписчиков

Аннотация

At the preliminary design stage, the closure of the Bureya river was scheduled for October 20, 2015. The actual status of construction necessitated rescheduling the river closure for March 20, 2016, alteration of design discharges, 3D simulation, and adjustment of design solutions. The actual conditions of river closure on April 19, 2016 are described.

Об авторах

A. Il’inskaya

JSC Lenhydroproject

Автор, ответственный за переписку.
Email: office@lhp.ru
Россия, St. Petersburg

A. Bobkov

JSC Lenhydroproject

Email: office@lhp.ru
Россия, St. Petersburg

V. Gara

JSC Lenhydroproject

Email: office@lhp.ru
Россия, St. Petersburg

A. Pareshnev

JSC Lenhydroproject

Email: office@lhp.ru
Россия, St. Petersburg

V. Petrov

JSC Lenhydroproject

Email: office@lhp.ru
Россия, St. Petersburg


© Springer Science+Business Media, LLC, 2017

Данный сайт использует cookie-файлы

Продолжая использовать наш сайт, вы даете согласие на обработку файлов cookie, которые обеспечивают правильную работу сайта.

О куки-файлах