Limitation of Transient Recovery Voltage When Using Shunt Reactors in 110 – 220 kV Networks
- Autores: Lyubarskii D.R.1, Rubtsov A.A.1
-
Afiliações:
- JSC Institute Energosetproekt
- Edição: Volume 51, Nº 2 (2017)
- Páginas: 247-250
- Seção: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245755
- DOI: https://doi.org/10.1007/s10749-017-0818-8
- ID: 245755
Citar
Resumo
In design practice there often arises the problem of assessing the feasibility of installing shunt reactors (SR) when observing conditions of the occurrence of admissible transient recovery voltages at circuit breaker contacts during switching action. A simplified design methodology for this purpose is proposed for calculating the defining parameters of the SR connection circuit, making it possible to define the feasibility of its use in the analyzed circuit.
Palavras-chave
Sobre autores
D. Lyubarskii
JSC Institute Energosetproekt
Email: rubtsov_a@aoesp.ru
Rússia, Moscow
A. Rubtsov
JSC Institute Energosetproekt
Autor responsável pela correspondência
Email: rubtsov_a@aoesp.ru
Rússia, Moscow
Arquivos suplementares
