In design practice there often arises the problem of assessing the feasibility of installing shunt reactors (SR) when observing conditions of the occurrence of admissible transient recovery voltages at circuit breaker contacts during switching action. A simplified design methodology for this purpose is proposed for calculating the defining parameters of the SR connection circuit, making it possible to define the feasibility of its use in the analyzed circuit.

About the authors

D. R. Lyubarskii

JSC Institute Energosetproekt

Email: rubtsov_a@aoesp.ru
Russian Federation, Moscow

A. A. Rubtsov

JSC Institute Energosetproekt

Author for correspondence.
Email: rubtsov_a@aoesp.ru
Russian Federation, Moscow


Copyright (c) 2017 Springer Science+Business Media, LLC

This website uses cookies

You consent to our cookies if you continue to use our website.

About Cookies