Development and Study of the Start-Up Sequence for E-240-13.8-560 Solid-Fuel-Fired Boiler by the Zio Company
- Авторлар: Pleshanov K.A.1,2, Sterkhov K.V.1,2, Knyaz’kov V.P.1, Kvrivishvili A.R.1
-
Мекемелер:
- JSC “Machine-Building Factory of Podolsk,”
- National Research University “Moscow Power Engineering Institute,”
- Шығарылым: Том 52, № 3 (2018)
- Беттер: 328-335
- Бөлім: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/246201
- DOI: https://doi.org/10.1007/s10749-018-0954-9
- ID: 246201
Дәйексөз келтіру
Аннотация
The results of the development and study of the start-up sequence for an E-240-13.8-560KT steam boiler are presented. Criteria of reliable operation of boiler components during start-up are proposed. The change in the main operating conditions of the boiler during start-up is described. The use of emergency start-up injection is justified. The effect of the wall thickness of the drum on the start-up of the boiler is analyzed.
Негізгі сөздер
Авторлар туралы
K. Pleshanov
JSC “Machine-Building Factory of Podolsk,”; National Research University “Moscow Power Engineering Institute,”
Хат алмасуға жауапты Автор.
Email: PleshanovKA@mpei.ru
Ресей, Podolsk; Moscow
K. Sterkhov
JSC “Machine-Building Factory of Podolsk,”; National Research University “Moscow Power Engineering Institute,”
Email: PleshanovKA@mpei.ru
Ресей, Podolsk; Moscow
V. Knyaz’kov
JSC “Machine-Building Factory of Podolsk,”
Email: PleshanovKA@mpei.ru
Ресей, Podolsk
A. Kvrivishvili
JSC “Machine-Building Factory of Podolsk,”
Email: PleshanovKA@mpei.ru
Ресей, Podolsk
Қосымша файлдар
