The results of the development and study of the start-up sequence for an E-240-13.8-560KT steam boiler are presented. Criteria of reliable operation of boiler components during start-up are proposed. The change in the main operating conditions of the boiler during start-up is described. The use of emergency start-up injection is justified. The effect of the wall thickness of the drum on the start-up of the boiler is analyzed.

About the authors

K. A. Pleshanov

JSC “Machine-Building Factory of Podolsk,”; National Research University “Moscow Power Engineering Institute,”

Author for correspondence.
Email: PleshanovKA@mpei.ru
Russian Federation, Podolsk; Moscow

K. V. Sterkhov

JSC “Machine-Building Factory of Podolsk,”; National Research University “Moscow Power Engineering Institute,”

Email: PleshanovKA@mpei.ru
Russian Federation, Podolsk; Moscow

V. P. Knyaz’kov

JSC “Machine-Building Factory of Podolsk,”

Email: PleshanovKA@mpei.ru
Russian Federation, Podolsk

A. R. Kvrivishvili

JSC “Machine-Building Factory of Podolsk,”

Email: PleshanovKA@mpei.ru
Russian Federation, Podolsk

Supplementary files

Supplementary Files
Action
1. JATS XML

Copyright (c) 2018 Springer Science+Business Media, LLC, part of Springer Nature