Experience of Designing and Constructing the Lower Bureya Earth-Fill Dam with an Impervious Diaphragm Made from Secant Bored Piles
- Authors: Borzunov V.V.1, Denisov G.V.1, Kadushkina E.A.1, Nikolaeva E.A.1, Fedorov A.V.1
-
Affiliations:
- JSC “Lengidroproekt,” St. Petersburg
- Issue: Vol 53, No 4 (2019)
- Pages: 420-428
- Section: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/246540
- DOI: https://doi.org/10.1007/s10749-019-01094-w
- ID: 246540
Cite item
Abstract
The design experience and construction stages of the Lower Bureya earth-fill run-of-river dam with an impervious diaphragm (“wall in trench”) made from secant bored piles are described. Recommendations for subsequent projects are formulated.
About the authors
V. V. Borzunov
JSC “Lengidroproekt,” St. Petersburg
Author for correspondence.
Email: office@lhp.ru
Russian Federation, Moscow
G. V. Denisov
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Russian Federation, Moscow
E. A. Kadushkina
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Russian Federation, Moscow
E. A. Nikolaeva
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Russian Federation, Moscow
A. V. Fedorov
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Russian Federation, Moscow