Experience of Designing and Constructing the Lower Bureya Earth-Fill Dam with an Impervious Diaphragm Made from Secant Bored Piles
- Autores: Borzunov V.V.1, Denisov G.V.1, Kadushkina E.A.1, Nikolaeva E.A.1, Fedorov A.V.1
-
Afiliações:
- JSC “Lengidroproekt,” St. Petersburg
- Edição: Volume 53, Nº 4 (2019)
- Páginas: 420-428
- Seção: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/246540
- DOI: https://doi.org/10.1007/s10749-019-01094-w
- ID: 246540
Citar
Resumo
The design experience and construction stages of the Lower Bureya earth-fill run-of-river dam with an impervious diaphragm (“wall in trench”) made from secant bored piles are described. Recommendations for subsequent projects are formulated.
Sobre autores
V. Borzunov
JSC “Lengidroproekt,” St. Petersburg
Autor responsável pela correspondência
Email: office@lhp.ru
Rússia, Moscow
G. Denisov
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Rússia, Moscow
E. Kadushkina
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Rússia, Moscow
E. Nikolaeva
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Rússia, Moscow
A. Fedorov
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Rússia, Moscow
Arquivos suplementares
