Experience of Designing and Constructing the Lower Bureya Earth-Fill Dam with an Impervious Diaphragm Made from Secant Bored Piles
- Авторы: Borzunov V.V.1, Denisov G.V.1, Kadushkina E.A.1, Nikolaeva E.A.1, Fedorov A.V.1
-
Учреждения:
- JSC “Lengidroproekt,” St. Petersburg
- Выпуск: Том 53, № 4 (2019)
- Страницы: 420-428
- Раздел: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/246540
- DOI: https://doi.org/10.1007/s10749-019-01094-w
- ID: 246540
Цитировать
Аннотация
The design experience and construction stages of the Lower Bureya earth-fill run-of-river dam with an impervious diaphragm (“wall in trench”) made from secant bored piles are described. Recommendations for subsequent projects are formulated.
Об авторах
V. Borzunov
JSC “Lengidroproekt,” St. Petersburg
Автор, ответственный за переписку.
Email: office@lhp.ru
Россия, Moscow
G. Denisov
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Россия, Moscow
E. Kadushkina
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Россия, Moscow
E. Nikolaeva
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Россия, Moscow
A. Fedorov
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Россия, Moscow
Дополнительные файлы
