Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés
- Authors: Voronov E.O.1, Kramarenko S.V.2, Tarashchuk A.M.2, Radin Y.A.3, Chertkov A.I.3
-
Affiliations:
- SPA “Belénergo”
- JSC “Belénergoremnaladka”
- JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)
- Issue: Vol 50, No 5 (2017)
- Pages: 525-529
- Section: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245422
- DOI: https://doi.org/10.1007/s10749-017-0744-9
- ID: 245422
Cite item