Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

Presented are the results of trial runs, comprehensive testing, and the power ascension of the K-175-180-12,7 steam turbine of Unit 5 at the Berezovskaya GRÉS, topped with two 29 MW gas turbines (SGT700) that exhaust to the furnaces. Features of starting up the steam turbine with combined high-intermediate-pressure cylinder and dual-bypass thermal circuit and ways to ensure reliable normal operation are considered.

Sobre autores

E. Voronov

SPA “Belénergo”

Autor responsável pela correspondência
Email: vti@vti.ru
Belarus, Minsk

S. Kramarenko

JSC “Belénergoremnaladka”

Email: vti@vti.ru
Belarus, Minsk

A. Tarashchuk

JSC “Belénergoremnaladka”

Email: vti@vti.ru
Belarus, Minsk

Yu. Radin

JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)

Email: vti@vti.ru
Rússia, Moscow

A. Chertkov

JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)

Email: vti@vti.ru
Rússia, Moscow

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Springer Science+Business Media New York, 2017