Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

Presented are the results of trial runs, comprehensive testing, and the power ascension of the K-175-180-12,7 steam turbine of Unit 5 at the Berezovskaya GRÉS, topped with two 29 MW gas turbines (SGT700) that exhaust to the furnaces. Features of starting up the steam turbine with combined high-intermediate-pressure cylinder and dual-bypass thermal circuit and ways to ensure reliable normal operation are considered.

作者简介

E. Voronov

SPA “Belénergo”

编辑信件的主要联系方式.
Email: vti@vti.ru
白俄罗斯, Minsk

S. Kramarenko

JSC “Belénergoremnaladka”

Email: vti@vti.ru
白俄罗斯, Minsk

A. Tarashchuk

JSC “Belénergoremnaladka”

Email: vti@vti.ru
白俄罗斯, Minsk

Yu. Radin

JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)

Email: vti@vti.ru
俄罗斯联邦, Moscow

A. Chertkov

JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)

Email: vti@vti.ru
俄罗斯联邦, Moscow

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media New York, 2017