Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés
- 作者: Voronov E.O.1, Kramarenko S.V.2, Tarashchuk A.M.2, Radin Y.A.3, Chertkov A.I.3
-
隶属关系:
- SPA “Belénergo”
- JSC “Belénergoremnaladka”
- JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)
- 期: 卷 50, 编号 5 (2017)
- 页面: 525-529
- 栏目: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245422
- DOI: https://doi.org/10.1007/s10749-017-0744-9
- ID: 245422
如何引用文章
详细
Presented are the results of trial runs, comprehensive testing, and the power ascension of the K-175-180-12,7 steam turbine of Unit 5 at the Berezovskaya GRÉS, topped with two 29 MW gas turbines (SGT700) that exhaust to the furnaces. Features of starting up the steam turbine with combined high-intermediate-pressure cylinder and dual-bypass thermal circuit and ways to ensure reliable normal operation are considered.
作者简介
E. Voronov
SPA “Belénergo”
编辑信件的主要联系方式.
Email: vti@vti.ru
白俄罗斯, Minsk
S. Kramarenko
JSC “Belénergoremnaladka”
Email: vti@vti.ru
白俄罗斯, Minsk
A. Tarashchuk
JSC “Belénergoremnaladka”
Email: vti@vti.ru
白俄罗斯, Minsk
Yu. Radin
JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)
Email: vti@vti.ru
俄罗斯联邦, Moscow
A. Chertkov
JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)
Email: vti@vti.ru
俄罗斯联邦, Moscow
补充文件
