Equivalent Scheme for Calculating Short-Circuit Current in an Alternating-Current Electric Traction Network
- 作者: German L.A.1, Serebryakov A.S.2, Osokin V.L.2, Subkhanverdiev K.S.3
-
隶属关系:
- Nizhny Novgorod Branch, Samara State Transport University
- Nizhny Novgorod State University of Engineering and Economics
- Design and Survey Institute of Electrification of Railways and Energy Installations Transelektroproekt
- 期: 卷 90, 编号 7 (2019)
- 页面: 516-521
- 栏目: Article
- URL: https://journals.rcsi.science/1068-3712/article/view/231578
- DOI: https://doi.org/10.3103/S1068371219070058
- ID: 231578
如何引用文章
详细
The authors have proved the feasibility of substitution of a three-phase power-supply system with a single-phase one when calculating three-phase circuits in electric traction network irrespectively of the external power supply arrangement. In addition, calculation features have been established for particular transformer winding connection configurations (Y/Y or Y/Δ). Based on results of an analysis performed for minimizing the methodological error in calculating the short-circuit currents, a single-phase equivalent circuit has been developed for the intersubstation zone of the traction network, which takes into account the connection between two adjacent substations via an overhead transmission line of 110 (220) kV. An example of calculation in accordance with the proposed replacement scheme is given.
作者简介
L. German
Nizhny Novgorod Branch, Samara State Transport University
编辑信件的主要联系方式.
Email: journal-elektrotechnika@mail.ru
俄罗斯联邦, Nizhny Novgorod, 603011
A. Serebryakov
Nizhny Novgorod State University of Engineering and Economics
Email: journal-elektrotechnika@mail.ru
俄罗斯联邦, Knyaginino, 606340
V. Osokin
Nizhny Novgorod State University of Engineering and Economics
Email: journal-elektrotechnika@mail.ru
俄罗斯联邦, Knyaginino, 606340
K. Subkhanverdiev
Design and Survey Institute of Electrification of Railways and Energy Installations Transelektroproekt
Email: journal-elektrotechnika@mail.ru
俄罗斯联邦, Moscow, 127051
补充文件
