| Issue | 
	Title | 
	File | 
		| Vol 55, No 2 (2019) | 
	Multi-Attribute Scenario Analysis of Protection of Drmno Open Pit Mine against Groundwater | 
	
                	 | 
	| 
		Šubaranović T., Vujić S., Radosavljević M., Dimitrijević B., Ilić S., Krunić D.J.
	 | 
		| Vol 54, No 1 (2018) | 
	Multi-Functional Mine Shaft Alarm System | 
	
                	 | 
	| 
		Golushko S.K., Cheido G.P., Shakirov R.A., Shakirov S.R., Shevchenko D.O.
	 | 
		| Vol 52, No 3 (2016) | 
	Multiple directional hydraulic fracturing with chemically active mixtures | 
	
                	 | 
	| 
		Kolykhalov I.V., Patutin A.V.
	 | 
		| Vol 54, No 1 (2018) | 
	Multi-Purpose Use of Caustobioliths of Carbonic Series Based on Innovative Coal Chemistry Technologies in the Far East of Russia | 
	
                	 | 
	| 
		Sorokin A.P., Savchenko I.F., Noskova L.P., Kuz’minykh V.M., Konyushok A.A., Rimkevich V.S., Krapiventseva V.V.
	 | 
		| Vol 52, No 4 (2016) | 
	Nanorange mechanical and fractal properties of rock salt crystal surface and their effect on fracture toughness and wettability | 
	
                	 | 
	| 
		Aptukov V.N., Mitin V.Y.
	 | 
		| Vol 53, No 1 (2017) | 
	New Approach to Monitoring Induced Earthquakes | 
	
                	 | 
	| 
		Adushkin V.V., Kishkina S.B., Kocharyan G.G.
	 | 
		| Vol 54, No 4 (2018) | 
	New Support Suggestions to High Swelling Clayey Rock Mass | 
	
                	 | 
	| 
		Uyar G.G., Aksoy C.O.
	 | 
		| Vol 52, No 5 (2016) | 
	New technology and equipment for non-explosive formation of free face in deep open pit mines | 
	
                	 | 
	| 
		Levenson S.Y., Lantsevich M.A., Gendlina L.I., Akishev A.N.
	 | 
		| Vol 53, No 3 (2017) | 
	New-Way Determination of the Degree of Loading of a Pillar | 
	
                	 | 
	| 
		Aptukov V.N., Vaulina I.B.
	 | 
		| Vol 53, No 2 (2017) | 
	Nonlinear relationships between coalbed methane release, natural methane content and kinematic parameters of cutting picks of shearers | 
	
                	 | 
	| 
		Ordin A.A., Timoshenko A.M.
	 | 
		| Vol 53, No 1 (2017) | 
	Numeric Evaluation of Kinematic and Dynamic Characteristics of Mineral Treatment in Disintegrator | 
	
                	 | 
	| 
		Urakaev F.K., Yusupov T.S.
	 | 
		| Vol 52, No 4 (2016) | 
	Numerical modeling of elastic energy accumulation and release in structurally heterogeneous geomaterials | 
	
                	 | 
	| 
		Lavrikov S.V., Revuzhenko A.F.
	 | 
		| Vol 53, No 4 (2017) | 
	Numerical Modeling of Ground Movement due to Twin Tunnel Structure of Esfahan Subway, Iran | 
	
                	 | 
	| 
		Moosavi E., Shirinabadi R., Rahimi E., Gholinejad M.
	 | 
		| Vol 52, No 2 (2016) | 
	Numerical solution of plane hydrofracture problem in modified formulation under arbitrary initial conditions | 
	
                	 | 
	| 
		Linkov A.M.
	 | 
		| Vol 55, No 1 (2019) | 
	Open Pit Mining Technologies for Watered Lignite Deposits in the Kansk—Achinsk Basin | 
	
                	 | 
	| 
		Reznik A.V., Cheskidov V.I.
	 | 
		| Vol 52, No 6 (2016) | 
	Open-hole multistage hydraulic fracturing system | 
	
                	 | 
	| 
		Serdyukov S.V., Degtyareva N.V., Patutin A.V., Shilova T.V.
	 | 
		| Vol 52, No 6 (2016) | 
	Optimal combination technology for high-grade quartz production based on modeling | 
	
                	 | 
	| 
		Sokolov I.V., Smirnov A.A., Antipin Y.G., Baranovsky K.V., Rozhkov A.A.
	 | 
		| Vol 52, No 4 (2016) | 
	Optimal design of mine ventilation system using a ventilation improvement index | 
	
                	 | 
	| 
		Lee D.
	 | 
		| Vol 52, No 5 (2016) | 
	Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade | 
	
                	 | 
	| 
		Moosavi E., Gholamnejad J.
	 | 
		| Vol 52, No 4 (2016) | 
	Optimal mill cut-off grade modeling in the mineral deposits via MIP: Haftcheshmeh copper deposit | 
	
                	 | 
	| 
		Gholinejad M., Moosavi E.
	 | 
		| Vol 54, No 4 (2018) | 
	Optimization of Longwall Parameters in Underground Mining of Thick Methane-Bearing Coal Seam in the Sokolovo Deposit in Kuzbass | 
	
                	 | 
	| 
		Ordin A.A., Timoshenko A.M., Botvenko D.V., Meshkov A.A., Volkov M.A.
	 | 
		| Vol 53, No 3 (2017) | 
	Optimizing Cupriferous Ore Output at Oktyabrsky Copper–Nickel Deposit, Considering Lag Factor | 
	
                	 | 
	| 
		Ordin A.A., Vasil’ev I.V.
	 | 
		| Vol 54, No 1 (2018) | 
	Optimizing Cutting Width and Capacity of Shearer Loaders in Longwall Mining of Gently Dipping Coal Seams | 
	
                	 | 
	| 
		Ordin A.A., Nikol’sky A.M.
	 | 
		| Vol 55, No 6 (2019) | 
	Optimizing Shearer Web Width in Underground Mining of Gently Dipping Methane-Bearing Coal Seams | 
	
                	 | 
	| 
		Ordin A.A., Timoshenko A.M., Botvenko D.V.
	 | 
		| Vol 54, No 2 (2018) | 
	Parameter Optimization of the Radioisotope Gamma Albedo Method for Controlling Quality of Variable Composition Coals | 
	
                	 | 
	| 
		Pak Y.N., Pak D.Y.
	 | 
	
		| 351 - 375 of 529 Items | 
		<< < 10 11 12 13 14 15 16 17 18 19 > >>  |