Planning and Scheduling Works in Concrete Products Plants
- Autores: Ryzhikov A.O.1, Firsov A.S.1, Khobotov E.N.1,2
-
Afiliações:
- Bauman Moscow State Technical University
- Trapeznikov Institute of Control Sciences
- Edição: Volume 80, Nº 8 (2019)
- Páginas: 1552-1560
- Seção: Automation in Industry
- URL: https://journals.rcsi.science/0005-1179/article/view/151146
- DOI: https://doi.org/10.1134/S0005117919080137
- ID: 151146
Citar
Resumo
The specificity of concrete products (CP) plants planning and scheduling is discussed. Design concepts of work schedules for such facilities are examined. Operation principles of scheduling algorithms are described.
Palavras-chave
Sobre autores
A. Ryzhikov
Bauman Moscow State Technical University
Autor responsável pela correspondência
Email: info@avtprom.ru
Rússia, Moscow
A. Firsov
Bauman Moscow State Technical University
Autor responsável pela correspondência
Email: info@avtprom.ru
Rússia, Moscow
E. Khobotov
Bauman Moscow State Technical University; Trapeznikov Institute of Control Sciences
Autor responsável pela correspondência
Email: e_khobotov@mail.ru
Rússia, Moscow; Moscow
Arquivos suplementares
