Planning and Scheduling Works in Concrete Products Plants
- Authors: Ryzhikov A.O.1, Firsov A.S.1, Khobotov E.N.1,2
- 
							Affiliations: 
							- Bauman Moscow State Technical University
- Trapeznikov Institute of Control Sciences
 
- Issue: Vol 80, No 8 (2019)
- Pages: 1552-1560
- Section: Automation in Industry
- URL: https://journals.rcsi.science/0005-1179/article/view/151146
- DOI: https://doi.org/10.1134/S0005117919080137
- ID: 151146
Cite item
Abstract
The specificity of concrete products (CP) plants planning and scheduling is discussed. Design concepts of work schedules for such facilities are examined. Operation principles of scheduling algorithms are described.
Keywords
About the authors
A. O. Ryzhikov
Bauman Moscow State Technical University
							Author for correspondence.
							Email: info@avtprom.ru
				                					                																			                												                	Russian Federation, 							Moscow						
A. S. Firsov
Bauman Moscow State Technical University
							Author for correspondence.
							Email: info@avtprom.ru
				                					                																			                												                	Russian Federation, 							Moscow						
E. N. Khobotov
Bauman Moscow State Technical University; Trapeznikov Institute of Control Sciences
							Author for correspondence.
							Email: e_khobotov@mail.ru
				                					                																			                												                	Russian Federation, 							Moscow; Moscow						
Supplementary files
 
				
			 
					 
						 
						 
						 
						 
				 
  
  
  
  
  Email this article
			Email this article  Open Access
		                                Open Access Access granted
						Access granted Subscription Access
		                                		                                        Subscription Access
		                                					