Possibilities for Optimizing the Self-Starting Process of Auxiliary Electric Motors at a Nuclear Power Plant


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The existing technique of switching on the auxiliary reserve network of an NPP formulates the switch-on commands directly after a shutdown. Due to delay in activating the automatic switch, the command is completed with a certain time delay. The nature of the subsequent processes is not very predictable. It is proposed to determine, based on developed computer models of the actual equipment, the moments of formation of the reserve activation commands, thus ensuring smaller perturbations at the subsequent switch-on.

作者简介

K. Krutikov

Smolensk Branch of the National Research University Moscow Power Engineering Institute

编辑信件的主要联系方式.
Email: umo@sbmpei.ru
俄罗斯联邦, Smolensk

V. Rozhkov

Smolensk Branch of the National Research University Moscow Power Engineering Institute

Email: umo@sbmpei.ru
俄罗斯联邦, Smolensk

S. Butrimov

Branch of Rosénergoatom Concern JSC, Smolensk Nuclear Power Plant

Email: umo@sbmpei.ru
俄罗斯联邦, Desnogorsk, Smolensk oblast

V. Ivanov

Branch of Rosénergoatom Concern JSC, Smolensk Nuclear Power Plant

Email: umo@sbmpei.ru
俄罗斯联邦, Desnogorsk, Smolensk oblast

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media, LLC, part of Springer Nature, 2018