Possibilities for Optimizing the Self-Starting Process of Auxiliary Electric Motors at a Nuclear Power Plant


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

The existing technique of switching on the auxiliary reserve network of an NPP formulates the switch-on commands directly after a shutdown. Due to delay in activating the automatic switch, the command is completed with a certain time delay. The nature of the subsequent processes is not very predictable. It is proposed to determine, based on developed computer models of the actual equipment, the moments of formation of the reserve activation commands, thus ensuring smaller perturbations at the subsequent switch-on.

Sobre autores

K. Krutikov

Smolensk Branch of the National Research University Moscow Power Engineering Institute

Autor responsável pela correspondência
Email: umo@sbmpei.ru
Rússia, Smolensk

V. Rozhkov

Smolensk Branch of the National Research University Moscow Power Engineering Institute

Email: umo@sbmpei.ru
Rússia, Smolensk

S. Butrimov

Branch of Rosénergoatom Concern JSC, Smolensk Nuclear Power Plant

Email: umo@sbmpei.ru
Rússia, Desnogorsk, Smolensk oblast

V. Ivanov

Branch of Rosénergoatom Concern JSC, Smolensk Nuclear Power Plant

Email: umo@sbmpei.ru
Rússia, Desnogorsk, Smolensk oblast

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Springer Science+Business Media, LLC, part of Springer Nature, 2018