Possibilities for Optimizing the Self-Starting Process of Auxiliary Electric Motors at a Nuclear Power Plant
- Авторлар: Krutikov K.K.1, Rozhkov V.V.1, Butrimov S.G.2, Ivanov V.N.2
-
Мекемелер:
- Smolensk Branch of the National Research University Moscow Power Engineering Institute
- Branch of Rosénergoatom Concern JSC, Smolensk Nuclear Power Plant
- Шығарылым: Том 51, № 6 (2018)
- Беттер: 719-727
- Бөлім: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/246051
- DOI: https://doi.org/10.1007/s10749-018-0899-z
- ID: 246051
Дәйексөз келтіру
Аннотация
The existing technique of switching on the auxiliary reserve network of an NPP formulates the switch-on commands directly after a shutdown. Due to delay in activating the automatic switch, the command is completed with a certain time delay. The nature of the subsequent processes is not very predictable. It is proposed to determine, based on developed computer models of the actual equipment, the moments of formation of the reserve activation commands, thus ensuring smaller perturbations at the subsequent switch-on.
Авторлар туралы
K. Krutikov
Smolensk Branch of the National Research University Moscow Power Engineering Institute
Хат алмасуға жауапты Автор.
Email: umo@sbmpei.ru
Ресей, Smolensk
V. Rozhkov
Smolensk Branch of the National Research University Moscow Power Engineering Institute
Email: umo@sbmpei.ru
Ресей, Smolensk
S. Butrimov
Branch of Rosénergoatom Concern JSC, Smolensk Nuclear Power Plant
Email: umo@sbmpei.ru
Ресей, Desnogorsk, Smolensk oblast
V. Ivanov
Branch of Rosénergoatom Concern JSC, Smolensk Nuclear Power Plant
Email: umo@sbmpei.ru
Ресей, Desnogorsk, Smolensk oblast
Қосымша файлдар
