Possibilities for Optimizing the Self-Starting Process of Auxiliary Electric Motors at a Nuclear Power Plant


Дәйексөз келтіру

Толық мәтін

Ашық рұқсат Ашық рұқсат
Рұқсат жабық Рұқсат берілді
Рұқсат жабық Тек жазылушылар үшін

Аннотация

The existing technique of switching on the auxiliary reserve network of an NPP formulates the switch-on commands directly after a shutdown. Due to delay in activating the automatic switch, the command is completed with a certain time delay. The nature of the subsequent processes is not very predictable. It is proposed to determine, based on developed computer models of the actual equipment, the moments of formation of the reserve activation commands, thus ensuring smaller perturbations at the subsequent switch-on.

Авторлар туралы

K. Krutikov

Smolensk Branch of the National Research University Moscow Power Engineering Institute

Хат алмасуға жауапты Автор.
Email: umo@sbmpei.ru
Ресей, Smolensk

V. Rozhkov

Smolensk Branch of the National Research University Moscow Power Engineering Institute

Email: umo@sbmpei.ru
Ресей, Smolensk

S. Butrimov

Branch of Rosénergoatom Concern JSC, Smolensk Nuclear Power Plant

Email: umo@sbmpei.ru
Ресей, Desnogorsk, Smolensk oblast

V. Ivanov

Branch of Rosénergoatom Concern JSC, Smolensk Nuclear Power Plant

Email: umo@sbmpei.ru
Ресей, Desnogorsk, Smolensk oblast

Қосымша файлдар

Қосымша файлдар
Әрекет
1. JATS XML

© Springer Science+Business Media, LLC, part of Springer Nature, 2018