Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine
- 作者: Anisimov A.1, Klub M.1, Sargsyan K.2, Eritsyan S.2, Petrosyan G.2, Avtandilyan A.2, Gevorgyan A.2
-
隶属关系:
- LvivORGRES
- “Hrazdan-5” of JSC “Gazprom Armenia,”
- 期: 卷 49, 编号 5 (2016)
- 页面: 359-364
- 栏目: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/244954
- DOI: https://doi.org/10.1007/s10749-016-0628-4
- ID: 244954
如何引用文章
详细
The principles of starting up the steam power unit of the Hrazdan-5 fully fired combined-cycle power unit (Hrazdan, Armenia) are considered. This plant has neither a bypass stack for gas discharge from the gas turbine nor an external steam source for the steam-turbine gland and prestarting deaeration. Emphasis is placed on the differences between the start-up procedure followed at the plant and the procedure provided by the RD 34.25.512 Standard Instructions on Startup from Various Thermal States and Shutdown of 300-MW Boiler-Turbine Sets with K-300-240 LMZ Turbine.
作者简介
A. Anisimov
LvivORGRES
编辑信件的主要联系方式.
Email: anisimov.o@email.ua
乌克兰, Lviv
M. Klub
LvivORGRES
Email: anisimov.o@email.ua
乌克兰, Lviv
K. Sargsyan
“Hrazdan-5” of JSC “Gazprom Armenia,”
Email: anisimov.o@email.ua
亚美尼亚, Hrazdan
S. Eritsyan
“Hrazdan-5” of JSC “Gazprom Armenia,”
Email: anisimov.o@email.ua
亚美尼亚, Hrazdan
G. Petrosyan
“Hrazdan-5” of JSC “Gazprom Armenia,”
Email: anisimov.o@email.ua
亚美尼亚, Hrazdan
A. Avtandilyan
“Hrazdan-5” of JSC “Gazprom Armenia,”
Email: anisimov.o@email.ua
亚美尼亚, Hrazdan
A. Gevorgyan
“Hrazdan-5” of JSC “Gazprom Armenia,”
Email: anisimov.o@email.ua
亚美尼亚, Hrazdan