Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The principles of starting up the steam power unit of the Hrazdan-5 fully fired combined-cycle power unit (Hrazdan, Armenia) are considered. This plant has neither a bypass stack for gas discharge from the gas turbine nor an external steam source for the steam-turbine gland and prestarting deaeration. Emphasis is placed on the differences between the start-up procedure followed at the plant and the procedure provided by the RD 34.25.512 Standard Instructions on Startup from Various Thermal States and Shutdown of 300-MW Boiler-Turbine Sets with K-300-240 LMZ Turbine.

作者简介

A. Anisimov

LvivORGRES

编辑信件的主要联系方式.
Email: anisimov.o@email.ua
乌克兰, Lviv

M. Klub

LvivORGRES

Email: anisimov.o@email.ua
乌克兰, Lviv

K. Sargsyan

“Hrazdan-5” of JSC “Gazprom Armenia,”

Email: anisimov.o@email.ua
亚美尼亚, Hrazdan

S. Eritsyan

“Hrazdan-5” of JSC “Gazprom Armenia,”

Email: anisimov.o@email.ua
亚美尼亚, Hrazdan

G. Petrosyan

“Hrazdan-5” of JSC “Gazprom Armenia,”

Email: anisimov.o@email.ua
亚美尼亚, Hrazdan

A. Avtandilyan

“Hrazdan-5” of JSC “Gazprom Armenia,”

Email: anisimov.o@email.ua
亚美尼亚, Hrazdan

A. Gevorgyan

“Hrazdan-5” of JSC “Gazprom Armenia,”

Email: anisimov.o@email.ua
亚美尼亚, Hrazdan


版权所有 © Springer Science+Business Media New York, 2016
##common.cookie##