The principles of starting up the steam power unit of the Hrazdan-5 fully fired combined-cycle power unit (Hrazdan, Armenia) are considered. This plant has neither a bypass stack for gas discharge from the gas turbine nor an external steam source for the steam-turbine gland and prestarting deaeration. Emphasis is placed on the differences between the start-up procedure followed at the plant and the procedure provided by the RD 34.25.512 Standard Instructions on Startup from Various Thermal States and Shutdown of 300-MW Boiler-Turbine Sets with K-300-240 LMZ Turbine.

Об авторах

A. Anisimov

LvivORGRES

Автор, ответственный за переписку.
Email: anisimov.o@email.ua
Украина, Lviv

M. Klub

LvivORGRES

Email: anisimov.o@email.ua
Украина, Lviv

K. Sargsyan

“Hrazdan-5” of JSC “Gazprom Armenia,”

Email: anisimov.o@email.ua
Армения, Hrazdan

S. Eritsyan

“Hrazdan-5” of JSC “Gazprom Armenia,”

Email: anisimov.o@email.ua
Армения, Hrazdan

G. Petrosyan

“Hrazdan-5” of JSC “Gazprom Armenia,”

Email: anisimov.o@email.ua
Армения, Hrazdan

A. Avtandilyan

“Hrazdan-5” of JSC “Gazprom Armenia,”

Email: anisimov.o@email.ua
Армения, Hrazdan

A. Gevorgyan

“Hrazdan-5” of JSC “Gazprom Armenia,”

Email: anisimov.o@email.ua
Армения, Hrazdan


© Springer Science+Business Media New York, 2016

Данный сайт использует cookie-файлы

Продолжая использовать наш сайт, вы даете согласие на обработку файлов cookie, которые обеспечивают правильную работу сайта.

О куки-файлах