Analysis of the Phase Transition Zone Location in the Flow Section of the PGU-450T Steam Turbine During Various Modes of Operation
- Авторы: Lebedeva A.1, Berezinets P.2, Tkhabisimov A.1
-
Учреждения:
- National research University “MEI” (NIU “MEI”)
- JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)
- Выпуск: Том 52, № 4 (2018)
- Страницы: 438-443
- Раздел: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/246250
- DOI: https://doi.org/10.1007/s10749-018-0971-8
- ID: 246250
Цитировать
Аннотация
An estimate of the phase transition zone location in the flow section of the T-150-7.7 steam turbine operating as part of a 450 MW two-circuit combined cycle gas turbine unit during various modes of operation is provided. Stages were identified, in which stress corrosion cracking of the disks, as well as corrosion fatigue of the rotating blades are most likely to appear.
Ключевые слова
Об авторах
A. Lebedeva
National research University “MEI” (NIU “MEI”)
Автор, ответственный за переписку.
Email: lebedevaai@mpei.ru
Россия, Moscow
P. Berezinets
JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)
Email: lebedevaai@mpei.ru
Россия, Moscow
A. Tkhabisimov
National research University “MEI” (NIU “MEI”)
Email: lebedevaai@mpei.ru
Россия, Moscow