Analysis of the Phase Transition Zone Location in the Flow Section of the PGU-450T Steam Turbine During Various Modes of Operation
- Авторлар: Lebedeva A.1, Berezinets P.2, Tkhabisimov A.1
-
Мекемелер:
- National research University “MEI” (NIU “MEI”)
- JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)
- Шығарылым: Том 52, № 4 (2018)
- Беттер: 438-443
- Бөлім: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/246250
- DOI: https://doi.org/10.1007/s10749-018-0971-8
- ID: 246250
Дәйексөз келтіру
Аннотация
An estimate of the phase transition zone location in the flow section of the T-150-7.7 steam turbine operating as part of a 450 MW two-circuit combined cycle gas turbine unit during various modes of operation is provided. Stages were identified, in which stress corrosion cracking of the disks, as well as corrosion fatigue of the rotating blades are most likely to appear.
Негізгі сөздер
Авторлар туралы
A. Lebedeva
National research University “MEI” (NIU “MEI”)
Хат алмасуға жауапты Автор.
Email: lebedevaai@mpei.ru
Ресей, Moscow
P. Berezinets
JSC “All-Russia Thermal Engineering Institute” (JSC “VTI”)
Email: lebedevaai@mpei.ru
Ресей, Moscow
A. Tkhabisimov
National research University “MEI” (NIU “MEI”)
Email: lebedevaai@mpei.ru
Ресей, Moscow