Limitations on the Rate of Impoundment and Drawdown of a Concrete Dam Reservoir (Example of the Arch-Gravity Dam of the Sayano-Shushenskaya HPP)


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

Reasons are examined for the necessity of eliminating restrictions on the speed of impoundment (drawdown) of a reservoir, ensuring safe operation of the structure. The effect of the rate of change of the HWL on the rate of change of radial displacements of a dam is studied. It is shown that increasing the rate of reservoir impoundment does not worsen the stress-strain state of the structure.

Sobre autores

N. Vul’fovich

JSC Lengidroproekt

Autor responsável pela correspondência
Email: navulfovich@gmail.com
Rússia, St. Petersburg

L. Potekhin

JSC Lengidroproekt

Email: navulfovich@gmail.com
Rússia, St. Petersburg

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Springer Science+Business Media, LLC, part of Springer Nature, 2018