Limitations on the Rate of Impoundment and Drawdown of a Concrete Dam Reservoir (Example of the Arch-Gravity Dam of the Sayano-Shushenskaya HPP)
- Autores: Vul’fovich N.A.1, Potekhin L.P.1
-
Afiliações:
- JSC Lengidroproekt
- Edição: Volume 52, Nº 1 (2018)
- Páginas: 39-46
- Seção: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/246070
- DOI: https://doi.org/10.1007/s10749-018-0907-3
- ID: 246070
Citar
Resumo
Reasons are examined for the necessity of eliminating restrictions on the speed of impoundment (drawdown) of a reservoir, ensuring safe operation of the structure. The effect of the rate of change of the HWL on the rate of change of radial displacements of a dam is studied. It is shown that increasing the rate of reservoir impoundment does not worsen the stress-strain state of the structure.
Palavras-chave
Sobre autores
N. Vul’fovich
JSC Lengidroproekt
Autor responsável pela correspondência
Email: navulfovich@gmail.com
Rússia, St. Petersburg
L. Potekhin
JSC Lengidroproekt
Email: navulfovich@gmail.com
Rússia, St. Petersburg
Arquivos suplementares