Том 52, № 5 (2019)
- Жылы: 2019
- Мақалалар: 21
- URL: https://journals.rcsi.science/1570-145X/issue/view/15333
Article
Topological Interlocking of Operational Switching
Аннотация
Positions of interconnected switching devices determine the topological interlocks of switching operations at substations. The paper reviews two approaches for implementing programmable topological interlocks: offline and online. The paper highlights the disadvantages of offline and flexibility of online solutions. Anew object-topology approach to modeling of electrical networks is described. It allows applying the standard rules of topological interlocking automatically, both offline and online. An example of such automation is provided.
Torsional Vibrations of the Rotating Parts of a Hydroelectric Generating Set in Transient Processes of Hydroelectric Power Plants
Аннотация
Experience gained from studies of the transient processes that accompany torsional vibrations, including an analytic solution of the problem along with results of calculations of transient processes, is generalized. Features in the relationship between the driving torque of the turbine and the elastic moment on the shaft of the generating unit as a function of the point of application of jump in the load on the set are presented.
Development and Evaluation of a Method of Reducing Erosion Wear of Impellers
Аннотация
Results of numerical simulation of the process of heating of the nozzle blade of a steam turbine in order to reduce the concentration and sizes of droplets that can induce erosion are presented. Results of numerical simulation of the motion of polydisperse flow of moisture accompanied by the formation of a film on the surface of the blade are compared with experimental data. A technique of calculating heating of nozzle blades as an effective method of combatting erosion is developed. Results that show that the efficiency of heating is significantly higher than intrachannel separation are obtained.
Experimental Substantiation of Leveling the Zagorsk PSP-2 Powerhouse
Аннотация
This paper gives basic information on conducting experimental works to substantiate the design solutions for leveling the Zagorsk PSP-2 powerhouse. The compensation grouting technology for leveling the Zagorsk PSP-2 powerhouse is substantiated.
Impact of Accounting for Non-Horizontality of Hydro Reservoir Surface and Modern Norms of Hydroelectric Complexes Usage on Evaluation of Maximum Water Flow Pass-Through
Аннотация
Estimation of the maximum water flow pass-through with an exceedance probability of 0.01% through the structures of the Volga-Kama waterworks cascade is conducted, while accounting for disconnection of units and closing the spans of spillway structures. Calculations were performed with the use of dynamic curves and static curves for reservoir volumes. A comparative analysis of the obtained results was done.
Analysis of Causes, Experience in Monitoring, and Reduction of Increased Stator Vibration of Turbogenerators with Tangential Elastic Core Suspension Designs
Аннотация
The increased vibration of the stators in TGV series turbogenerators with tangential elastic core suspension is examined. The existing repair options for vibration reduction are reviewed briefly. Results are presented from a theoretical study of the dependence of the dynamic properties of turbogenerator stators on the rigidity with which the core is fastened to the intermediate frame and the rigidity with which the housing is fastened to the foundation. Based on these results, an improved technology is proposed for reducing the stator core vibration. This technology is applied to a type TGV-300 turbogenerator with an unsatisfactory vibrational state of the stator. An analysis of vibration monitor data prior to the repairs and for the subsequent two years of operation showed that these actions made it possible to reduce and stabilize the vibration of the stator core and housing. The effectiveness of these measures depends substantially on their timely application.
Adaptive Current Protection Against Earth Faults in 6 – 10 kV Cable Networks
Аннотация
In 6 – 10 kV cable networks with isolated neutral, overcurrent protections are widely applied to earth fault protection based on components of working frequency, and in compensated cable networks based on higher harmonics of the zero-sequence current. The selectivity and stability of functioning of the former is, to a significant extent, limited by the effect on their operation of transient processes during arc earth faults, and of the latter by the instability of the level of the higher harmonics in the SPEF current, depending on the network operating mode. An adaptive method is examined for implementing the specified protections to ensure improvement of their technical capability.
An Analytic Method of Calculating the Spirals of the Turbine Pits of Hydraulic Turbines Based on Different Laws of Variation of the Average Circumferential Velocity in Cross-Sections Along the Length of the Spiral
Аннотация
A new method of calculating the turbine spiral pits of hydraulic turbines with round cross-sections is proposed. The method generalizes techniques that are used today for determining the circular cross-sectional areas of a spiral with assigned or adopted area of its input cross-section. Any laws of variation of the average circumferential velocities in the cross-sections along the length of the spiral may be adopted in the method, which substantially expands the range of methods currently employed. By means of the method the dimensions of round and elliptical cross-sections of a spiral in the tooth region with the widely used conical scheme of coupling of its metal shell with the stator of the hydraulic turbine may be precisely determined.
Calculated Substantiation of Controlled Compensation Grouting for Lifting the Foundation Slab of Zagorsk PSP-2
Аннотация
The use of the finite element method for numerical prediction of the results of using the controlled compensation grouting method which allows compensating settlements of buildings and structures by lifting them is examined. The method is based on using two grout compositions. The first composition is used for impregnating the soil around the sleeves to create a homogeneous isotropic shell and the second for compensating settlements.
Development of Russian Once-Through Heat-Recovery Steam Generators for CCPPs of Various Capacities
Аннотация
The foreign experience of using once-through heat-recovery steam generators (HRSG) in CCPPs is presented. Russian developments of once-through HRSGs of various configurations based on modern gas turbines are considered. Design procedures for ensuring the reliability of the heating surfaces of high- and intermediate-pressure evaporators are developed. Technical requirements for the design of vertical and horizontal once-through HRSGs are formulated.
Contemporary Methods for Restoring Steam Turbine Blades
Аннотация
Methods for restoring steam turbine rotor blade erosion damage are reviewed. Favorable factors and shortcomings of the methods considered are analyzed. The most promising method for restoring rotor blades by laser-powder surfacing is recommended.
The Effect of Combining Information of Relay Protection Fault Detectors1
Аннотация
The mass introduction of new digital relay protection (RP) devices and the communications systems between them potentially makes it possible to increase the sensitivity of relay protection due to the introduction of multidimensional measurements. Amethod is proposed for effective combination of the measurements of a set of individual fault detectors, increasing the recognizability of RP modes. The method is based on the statistical theory of detection, the Bayesian criterion of minimizing the mean risk of decision-making.
Mathematical Modeling of Water Flow Through a Broad-Crested Spillway Using the CFD Code Star-CCM+
Аннотация
Water flow in a hydraulic flume is studied with a broad-crested spillway model. The research was conducted using the methods of computational hydrodynamics (CFD), as well as experimentally. Correspondence of calculated, experimental, and handbook data was obtained, and the shortcomings of the proposed CFD model were noted.
Correction
Thermal Power Plants
Heat-Recovery Steam Generators at Thermal Power Plants of Russia
Аннотация
Statistical data on heat-recovery steam generators (HRSGs) installed at Russian TPPs are presented. The dynamics of commissioning of HRSGs and their distribution according to the number of pressure levels, configurations (vertical or horizontal), power-generating entities, manufacturers, and the capacity of associated gas-turbine units are described. Information on the leading HRSG suppliers in Russia is given. It is proposed to create a once-through heat-recovery steam generator as a promising field for the development of the Russian boiler industry.
Hydrotechnical Construction
Power Systems and Electric Networks
Calculation of the Thermal Regime of Gas-Insulated Electrical Transmission Lines
Аннотация
Gas-insulated transmission lines (GIL) are used for high-power extraction from electric power plants and high power delivery to large cities and industrial centers. A large part of a GIL lies above the earth’s surface. In an overhead configuration GIL are subject to climatic factors that affect their transmission, which is determined by the thermal regime. A method for calculating the thermal regime of overhead GIL is developed which takes the influence of climatic factors into account. Calculations for a specific GIL design are presented and analyzed.