Abstract
A work package for filling the voids under the pumped-storage powerhouse and pressure grouting to strengthen the foundation soil is described. The compositions of the injectable grouts and specially designed composite material are presented. The results are analyzed.
Keywords
About the authors
V. M. Korolev
Gidrospetsproekt, Ltd.
Author for correspondence.
Email: labkorolev@yandex.ru
Russian Federation, Moscow
O. E. Smirnov
Gidrospetsproekt, Ltd.
Email: labkorolev@yandex.ru
Russian Federation, Moscow
É. S. Argal
Gidrospetsproekt, Ltd.
Email: labkorolev@yandex.ru
Russian Federation, Moscow
A. V. Radzinskii
Gidrospetsproekt, Ltd.
Email: labkorolev@yandex.ru
Russian Federation, Moscow
R. M. Kim
Gidrospetsproekt, Ltd.
Email: labkorolev@yandex.ru
Russian Federation, Moscow
A. V. Aleksandrov
Institute Hydroproject, Ltd.
Email: labkorolev@yandex.ru
Russian Federation, Moscow