Behavior of the Concrete and Rock-Fill Dam at the Boguchanskaya HPP During the Period of Reservoir Filling (2012 – 2015)


Cite item

Full Text

Open Access Open Access
Restricted Access Access granted
Restricted Access Subscription Access

Abstract

Problems during filling of the reservoir under frozen rock bed conditions and rock-fill dam body are examined. Thawing of the dam bed and body resulted in an incline in the direction of the upper pool, which in turn caused local opening of the joint between the concrete dam and the asphalt-concrete water wall, which is the water-impermeable core of the dam.

About the authors

A. N. Volynchikov

JSC “Institut Gidroproekt,”

Author for correspondence.
Email: dpr-boges@hydroproject.ru
Russian Federation, Moscow

É. G. Gaziev

Geodynamic Research Centre, an affiliate of JSC “Institut Gidroproekt,”

Author for correspondence.
Email: erastgaziev@mail.ru
Russian Federation, Moscow


Copyright (c) 2016 Springer Science+Business Media New York

This website uses cookies

You consent to our cookies if you continue to use our website.

About Cookies